4,089 plants indexed. Showing 21 matching current filters.
IMPIANTO VALLONE GARELLA is a closed secondary treatment plant in Burgio, Sicily, Italy, serving 3,503 people. It discharged 693.47 m³/day of treated wastewater near the coast.
LIDO AZZURRO is a closed secondary wastewater treatment plant in Porto Empedocle, Sicily, Italy, serving 4,000 people. It discharged 791.86 m³/day and had a designed capacity of 4,400 m³/day.
LUOGOSANTO_LOC_FUNTANEDDA is a closed primary treatment plant in Luogosanto, Sardinia, Italy. It served a population of 1,851 with a designed capacity of 2,748 m³/day.
MOTTA SAN GIOVANNI SAN VINCENZO is a closed advanced treatment plant in Antonimina, Calabria, Italy. It served 4,500 people with a designed capacity of 5,000 m³/day.
San Donato di Ninea Ficara is a closed secondary treatment plant in Verbicaro, Calabria, Italy. It served 550 people with a designed capacity of 600 m³/day and discharged 108.88 m³/day.
San Donato di Ninea Policastrello wastewater treatment plant in Villapiana, Calabria, Italy, serves 823 people with secondary treatment. The plant is now closed.
The San Mango d'Aquino Acquicella wastewater treatment plant in Calabria, Italy, serves a population of 1,900 with secondary treatment. It has a designed capacity of 2,500 m³/day and is located within 10 km of the coast.
Vaccarizzo Albanese Amendola is a closed secondary treatment plant in Calabria, Italy, serving 2,080 people. It discharged treated wastewater into the local watershed before closure.
ABBIADORI_ARZACHENA is a closed secondary treatment plant in Gallura Nord-Est Sardegna, Italy. It served the Arzachena area and discharged near the Sardinian coast.
AGUGLIANO_SUD_LATO_POLVERIGI_DEP is a closed advanced treatment plant in Polverigi, Marche, Italy. It had a designed capacity of 1,500 cubic meters per day and is located near the Adriatic coast.
Casale sul Sile Loc Lughignano Via Chiesa is a secondary wastewater treatment plant in Casale sul Sile, Veneto, Italy. The plant is now closed and located within 10 km of the coast.
Girola PIP CMP DEP is a closed primary treatment plant in Fermo, Italy, with a designed capacity of 1000 m³/day. Located within 10 km of the Adriatic coast, it served the local industrial area.
IDL_MIGLIARINO is a closed secondary treatment plant in Migliarino Pisano, Vecchiano, Tuscany, Italy. It had a designed capacity of 3,000 m³/day and is located within 10 km of the coast.
Impianto di C da Fontana is a closed primary treatment plant in Butera, Sicily, Italy. It had a designed capacity of 5,600 m³/day and is located within 10 km of the coast.
LAURIA_MATTATOIO is a closed secondary wastewater treatment plant in Lauria, Basilicata, Italy, with a designed capacity of 1000 m³/day. It is located within 10 km of the coast, indicating potential marine discharge considerations.
MATINO wastewater treatment plant in Matino, Puglia, Italy, is a closed secondary treatment facility located within 10 km of the coast. It served the local community under Italy's implementation of the EU Urban Waste Water Treatment Directive.
PARABITA is a closed secondary treatment plant in Matino, Puglia, Italy. It served the local area before ceasing operations, with its coastal location near the Ionian Sea.
Porto Tolle Via della Sacca di Scardovari is a closed secondary treatment plant in Scardovari, Veneto, Italy. It served the coastal area of the Po Delta before decommissioning.
Porto Tolle Viale G Di Vittorio Loc Donzella is a closed secondary treatment plant in Donzella, Veneto, Italy. It served the Porto Tolle area before ceasing operations.
RIVELLO_SAN_COSTANTINO is a closed secondary treatment plant in Rivello, Basilicata, Italy. It served the local population before ceasing operations.