4,089 plants indexed. Showing 1,953 matching current filters.
Maruggio wastewater treatment plant serves the town of Maruggio in Puglia, Italy. It provides secondary treatment for a population of 5,235 and discharges treated wastewater near the Ionian Sea coast.
Carmiano wastewater treatment plant in Puglia, Italy, serves about 6,500 people with secondary treatment. It discharges 870 cubic meters daily and has a design capacity of 16,543 cubic meters.
Sandonaci wastewater treatment plant serves San Donaci, Puglia, Italy, providing secondary treatment for a population of 8,409. The plant discharges 815.00 cubic meters of treated wastewater daily.
Torricella wastewater treatment plant in Monacizzo, Puglia, Italy, serves about 4,940 people with secondary treatment. It discharges 742.00 volume units and has a designed capacity of 10,000, operating near the Ionian Sea coast.
Palagianello wastewater treatment plant serves the town of Palagianello in Puglia, Italy, with secondary treatment. It has a designed capacity of 10,000 cubic meters per day and serves a population of 7,749.
Montemesola wastewater treatment plant serves the town of Montemesola in Puglia, Italy. It provides secondary treatment and discharges treated water into the local watershed.
LESINA_2_MARINA is a secondary treatment plant serving Marina di Lesina, Italy, with a designed capacity of 20,000 m³/day and a population equivalent of 4,714. It discharges treated wastewater near the Adriatic coast.
ISOLE_TREMITI wastewater treatment plant serves the Tremiti Islands in Foggia, Puglia, Italy. It provides advanced treatment for a population of 2,100, with a designed capacity of 5,000 m³/day.
Ischitella Nuovo is a secondary wastewater treatment plant in Ischitella, Puglia, Italy, serving 2,484 people. It discharges 476 m³/day and is located within 10 km of the Adriatic coast.
SPECCHIA wastewater treatment plant in Sogliano Cavour, Puglia, Italy, serves 5,000 people with secondary treatment. It discharges 627.00 cubic meters of treated wastewater daily.
Santa Cesarea Terme Nuovo is a secondary wastewater treatment plant in Cerfignano, Puglia, Italy, serving 2,787 people with a designed capacity of 9,500 m³/day.
CORROPOLI Z I is a secondary wastewater treatment plant serving Alba Adriatica, Abruzzo, Italy. It discharges treated effluent near the Adriatic coast, with a designed capacity of 5,000 m³/day.
CAMPLI_MORGE is a secondary wastewater treatment plant in Campli, Abruzzo, Italy, serving approximately 4,000 people. It discharges 791.86 m³/day of treated effluent into the local watershed.
CAMPLI_FLORIANO is a secondary wastewater treatment plant serving 2,400 people in Campli, Abruzzo, Italy. It discharges 475.12 m³/day and is located within 10 km of the Adriatic coast.
BELLANTE_STAZIONE is a secondary wastewater treatment plant serving Castellalto, Abruzzo, Italy. It treats wastewater for approximately 3,400 people with a designed capacity of 3,500 m³/day.
Basciano Salara is a secondary wastewater treatment plant serving 2,500 people in Basciano, Abruzzo, Italy. It discharges treated effluent into local water bodies within the Adriatic Sea basin.
TORREMONTANARA wastewater treatment plant serves Torrevecchia Teatina, Italy, with secondary treatment for a population of 1,800. The plant has a designed capacity of 2,000 m³/day and discharges 493.15 m³/day, located within 10 km of the Adriatic coa
CASTELFERRATO wastewater treatment plant in Torrevecchia Teatina, Abruzzo, Italy serves 1,200 people with secondary treatment. It discharges 295.89 m³/day and is located within 10 km of the Adriatic coast.
VALLE DELL'INFERNO is a secondary wastewater treatment plant in Torrevecchia Teatina, Abruzzo, Italy, serving 800 people. It discharges treated effluent near the Adriatic coast.
CAPOLUOGO_GIARDINO is a secondary wastewater treatment plant serving 2,400 people in Ripa Teatina, Abruzzo, Italy. It discharges 493.15 m³/day and is located within 10 km of the Adriatic coast.
UtilityRadar indexes 4089 wastewater treatment plants in Italy, with treatment level, capacity, operator and discharge data on each record.
Among the indexed plants, LESINA_2_MARINA has the highest designed capacity at 20,000 m3/day.