4,089 plants indexed. Showing 177 matching current filters.
IMPIANTO C DA NOCE is a secondary treatment plant in Marianopoli, Sicily, Italy, with a designed capacity of 2600 m³/day. It is now closed.
IDL Industriale Ex SMI is a closed secondary treatment plant in Campo Tizzoro, Toscana, Italy, with a designed capacity of 500 m³/day. It served the industrial area before decommissioning.
IDL_CAMPO_TIZZORRO is a closed secondary treatment plant in Campo Tizzoro, Tuscany, Italy. It served the local community before ceasing operations.
IDL_BARDALONE is a secondary treatment plant in Campo Tizzoro, Toscana, Italy. It has a designed capacity of 800 m³/day and is now closed.
IDL_MARESCA is a closed secondary treatment plant in Maresca, Toscana, Italy. It had a designed capacity of 1,000 m³/day and served the local mountain community.
IDL_PIETRICCIA is a closed secondary wastewater treatment plant in Chiusi, Toscana, Italy. It had a designed capacity of 2,700 m³/day and served the local community.
IDL_RUOTI is a closed secondary treatment plant in Chianciano Terme, Tuscany, Italy, with a designed capacity of 10,000 m³/day. It served the Valdichiana Senese area before closure.
IDL_VIA_EUROPA is a closed secondary treatment plant in Serravalle Pistoiese, Toscana, Italy. It served the local area before ceasing operations.
IDL_SANTOMATO is a closed secondary treatment plant in Santomato, Pistoia, Toscana, Italy. It served the local area before ceasing operations.
IDL_CANTAGRILLO is a closed secondary treatment plant in Cantagrillo, Serravalle Pistoiese, Tuscany, Italy. It served the local community before ceasing operations.
CAPOLAVILLA_FLG_DEP is a closed primary treatment plant in Civitella del Tronto, Abruzzo, Italy. It served the Val Vibrata area with a designed capacity of 600 cubic meters per day.
IDL_ALLENDE_ZONA_PEEP is a closed secondary treatment plant in Quarrata, Tuscany, Italy. It served the local population before ceasing operations.
IDL_LEVANE is a closed secondary treatment plant in Levane, Montevarchi, Tuscany, Italy. It served the local area before ceasing operations.
IDL_VIA_FIRENZE is a closed secondary treatment plant in Quarrata, Toscana, Italy. It served the local area before ceasing operations.
IDL_VIA_DELLA_TORRE is a closed secondary treatment plant in Firenze, Toscana, Italy. It served the local area before ceasing operations.
IDL_LA_FONTE is a closed secondary treatment plant in Incisa in Val d'Arno, Tuscany, Italy. It served the local community before ceasing operations.
IDL_CAVRIGLIA is a closed secondary treatment plant in Cavriglia, Toscana, Italy. It served the local municipality before ceasing operations.
AGUGLIANO_SUD_LATO_POLVERIGI_DEP is a closed advanced treatment plant in Polverigi, Marche, Italy. It had a designed capacity of 1,500 cubic meters per day and is located near the Adriatic coast.
Girola PIP CMP DEP is a closed primary treatment plant in Fermo, Italy, with a designed capacity of 1000 m³/day. Located within 10 km of the Adriatic coast, it served the local industrial area.
RIONE_CONCERIA_CMP_DEP is a closed primary treatment plant in Fermo, Marche, Italy. Located within 10 km of the Adriatic coast, it served the local area before decommissioning.
UtilityRadar indexes 4089 wastewater treatment plants in Italy, with treatment level, capacity, operator and discharge data on each record.
Among the indexed plants, IDL_RUOTI has the highest designed capacity at 10,000 m3/day.