Wastewater plants in Italy

4,089 plants indexed. Showing 3,912 matching current filters.

3,912 plants matching filters

ORDONA

Ordona, Puglia

ORDONA wastewater treatment plant in Ordona, Puglia, Italy, serves a population of 2,488 with secondary treatment. It discharges 298.00 volume units daily and has a designed capacity of 2,848.00.

Secondary 2,488 Low

MONTE_SANT_ANGELO_B

Monte Sant'Angelo, Puglia

Monte Sant'Angelo B is a secondary treatment plant in Puglia, Italy, serving about 3,900 people. It discharges treated wastewater near the Adriatic coast.

Secondary 3,924 Medium

MONTE_SANT_ANGELO_A

Monte Sant'Angelo, Puglia

Monte Sant'Angelo A is a secondary wastewater treatment plant in Puglia, Italy, serving about 5,774 people. It discharges treated effluent near the Adriatic coast, operating under EU Urban Waste Water Treatment Directive standards.

Secondary 5,774 Medium

MONTELEONE_DI_PUGLIA

Monteleone di Puglia, Puglia

Monteleone di Puglia wastewater treatment plant serves the town in Puglia, Italy, with secondary treatment. It processes 322 m³/day of wastewater for a population of 1,653.

Secondary 1,653 Low

FAETO_2

Faeto, Puglia

FAETO_2 is a secondary wastewater treatment plant serving Faeto, Puglia, Italy. It treats wastewater for a population of 281 with a designed capacity of 1,500 m³/day.

Secondary 281 Low

SANTA_LIBERATA

Lettomanoppello, Abruzzo

Santa Liberata wastewater treatment plant serves Lettomanoppello, Abruzzo, Italy. It provides secondary treatment for a population of 1,350 with a designed capacity of 800 m³/day.

Secondary 1,350 Low

FOGGIA_2_BORGO_INCORONATA

Foggia, Puglia

FOGGIA_2_BORGO_INCORONATA is a secondary treatment plant serving 807 people in Borgo Incoronata, Foggia, Puglia, Italy. It discharges 115.00 m³/day of treated wastewater, with a designed capacity of 784.00 m³/day.

Secondary 807 Low

VIBO_VALENTIA_IONADI_LOC_CERVO

Jonadi, Calabria

VIBO VALENTIA IONADI LOC CERVO is an advanced wastewater treatment plant in Jonadi, Calabria, Italy, serving about 4,540 people with a designed capacity of 2,500 m³/day.

Advanced 4,540 Medium

VERZINO_CANAL_GRANDE

Parenti, Calabria

VERZINO_CANAL_GRANDE is a secondary wastewater treatment plant serving about 2,000 people in Parenti, Calabria, Italy. It has a designed capacity of 2,000 m³/day and discharges approximately 396 m³/day of treated effluent.

Secondary 2,000 Low

VERBICARO_IARDINO

Verbicaro, Calabria

VERBICARO_IARDINO is an advanced wastewater treatment plant serving Verbicaro, Calabria, Italy. It treats wastewater from approximately 4,980 people with a designed capacity of 5,000 m³/day.

Advanced 4,980 Medium

VALLEFIORITA_CAPOLUOGO

Vallefiorita, Calabria

VALLEFIORITA_CAPOLUOGO is an advanced wastewater treatment plant serving Vallefiorita, Calabria, Italy. It treats wastewater for approximately 3,448 people with a designed capacity of 5,000 m³/day.

Advanced 3,448 Medium

TORANO_CASTELLO_VARAMETTO

Cerzeto, Calabria

TORANO CASTELLO VARAMETTO is an advanced wastewater treatment plant serving Cerzeto, Calabria, Italy. It treats wastewater for approximately 800 people with a designed capacity of 250 m³/day.

Advanced 800 Low

TORANO_CASTELLO_PERITANO

Torano Castello, Calabria

Torano Castello Peritano is an advanced wastewater treatment plant in Torano Castello, Calabria, Italy. It serves a population of 590 with a designed capacity of 250 m³/day and discharges 116.80 m³/day.

Advanced 590 Low

TORANO_CASTELLO_MASTROTO

Torano Castello, Calabria

Torano Castello Mastroto is an advanced wastewater treatment plant in Torano Castello, Calabria, Italy, serving 650 people with a design capacity of 500 m³/day and a discharge volume of 128.68 m³/day.

Advanced 650 Low

TORANO_CASTELLO_CUTURELLA

Sartano, Calabria

The Torano Castello Cuturella wastewater treatment plant in Sartano, Calabria, Italy, serves a population of 950 with advanced treatment. It discharges 188.07 cubic meters per day and has a designed capacity of 500 cubic meters per day.

Advanced 950 Low

TORANO_CASTELLO_CUPINI

Santa Maria le Grotte, Calabria

The TORANO CASTELLO CUPINI wastewater treatment plant in Santa Maria le Grotte, Calabria, Italy, serves about 1,500 people with advanced treatment. It has a designed capacity of 1,100 m³/day and discharges 296.95 m³/day.

Advanced 1,500 Low

TORANO_CASTELLO_ARIELLA

Sartano, Calabria

The Torano Castello Ariella wastewater treatment plant in Sartano, Calabria, Italy, serves a small population of 450 with secondary treatment. It discharges 89.08 cubic meters of treated wastewater daily.

Secondary 450 Low

CIVITA_SCALO

La Grancia, Unknown

CIVITA_SCALO wastewater treatment plant serves the La Grancia area in Morino, L'Aquila, Italy. It provides primary treatment for a population of 266, with a designed capacity of 450 m³/day.

Primary 266 Low

PERO_DEI_SANTI

Morino, Abruzzo

PERO DEI SANTI is a secondary wastewater treatment plant in Morino, Abruzzo, Italy, serving a population of 670. It discharges 132.64 cubic meters of treated wastewater daily, with a designed capacity of 450 cubic meters.

Secondary 670 Low

MORINO_CAPOLUOGO

La Grancia, Unknown

Morino Capoluogo is a secondary wastewater treatment plant serving La Grancia, Italy. It treats wastewater from a population of 1,877 with a design capacity of 1,500 cubic meters per day.

Secondary 1,877 Low

Frequently asked

How many wastewater treatment plants are in Italy?

UtilityRadar indexes 4089 wastewater treatment plants in Italy, with treatment level, capacity, operator and discharge data on each record.

What is the largest wastewater treatment plant in Italy?

Among the indexed plants, MONTE_SANT_ANGELO_A has the highest designed capacity at 11,750 m3/day.

UtilityRadar
More
Press Esc to close · Browse by sector