4,089 plants indexed. Showing 980 matching current filters.
SPECCHIA wastewater treatment plant in Sogliano Cavour, Puglia, Italy, serves 5,000 people with secondary treatment. It discharges 627.00 cubic meters of treated wastewater daily.
Santa Cesarea Terme Nuovo is a secondary wastewater treatment plant in Cerfignano, Puglia, Italy, serving 2,787 people with a designed capacity of 9,500 m³/day.
CORROPOLI Z I is a secondary wastewater treatment plant serving Alba Adriatica, Abruzzo, Italy. It discharges treated effluent near the Adriatic coast, with a designed capacity of 5,000 m³/day.
CAMPLI_MORGE is a secondary wastewater treatment plant in Campli, Abruzzo, Italy, serving approximately 4,000 people. It discharges 791.86 m³/day of treated effluent into the local watershed.
CAMPLI_FLORIANO is a secondary wastewater treatment plant serving 2,400 people in Campli, Abruzzo, Italy. It discharges 475.12 m³/day and is located within 10 km of the Adriatic coast.
BELLANTE_STAZIONE is a secondary wastewater treatment plant serving Castellalto, Abruzzo, Italy. It treats wastewater for approximately 3,400 people with a designed capacity of 3,500 m³/day.
Basciano Salara is a secondary wastewater treatment plant serving 2,500 people in Basciano, Abruzzo, Italy. It discharges treated effluent into local water bodies within the Adriatic Sea basin.
TORREMONTANARA wastewater treatment plant serves Torrevecchia Teatina, Italy, with secondary treatment for a population of 1,800. The plant has a designed capacity of 2,000 m³/day and discharges 493.15 m³/day, located within 10 km of the Adriatic coa
CASTELFERRATO wastewater treatment plant in Torrevecchia Teatina, Abruzzo, Italy serves 1,200 people with secondary treatment. It discharges 295.89 m³/day and is located within 10 km of the Adriatic coast.
VALLE DELL'INFERNO is a secondary wastewater treatment plant in Torrevecchia Teatina, Abruzzo, Italy, serving 800 people. It discharges treated effluent near the Adriatic coast.
CAPOLUOGO_GIARDINO is a secondary wastewater treatment plant serving 2,400 people in Ripa Teatina, Abruzzo, Italy. It discharges 493.15 m³/day and is located within 10 km of the Adriatic coast.
LUCINA secondary treatment plant serves Rapino, Italy, with a designed capacity of 2,500 m³/day and an average discharge of 630 m³/day, protecting local water quality.
SANT_EUFEMIA wastewater treatment plant in Fara Filiorum Petri, Abruzzo, Italy, provides secondary treatment for a small population of 550.
CAPOLUOGO_CREPACCE is a secondary wastewater treatment plant in Fara Filiorum Petri, Abruzzo, Italy, serving 2,200 people. It discharges treated effluent into local waterways, supporting the region's environmental health.
FAETO_1 is a secondary wastewater treatment plant in Faeto, Puglia, Italy, serving approximately 940 people with a designed capacity of 3,000 m³/day and a discharge volume of 328 m³/day.
The Deliceto wastewater treatment plant in Puglia, Italy, serves a population of 3,122 with secondary treatment. It discharges 636 cubic meters of treated wastewater daily, operating under EU Urban Waste Water Treatment Directive standards.
CHIEUTI wastewater treatment plant in Chieuti, Puglia, Italy, serves a population of 1,254 with secondary treatment. It discharges 255 m³/day and is located within 10 km of the coast.
CELENZA VALFORTORE NUOVO is a secondary wastewater treatment plant in Chieuti, Puglia, Italy, serving 1,436 people with a designed capacity of 2,091 m³/day and a discharge volume of 258 m³/day.
CASTELNUOVO_DELLA_DAUNIA_NUOVO is a secondary treatment plant serving Castelnuovo della Daunia, Puglia, Italy. It treats wastewater for approximately 1,735 people with a designed capacity of 4,509 cubic meters.
Castelluccio Valmaggiore wastewater treatment plant serves the town of Castelluccio Valmaggiore in Puglia, Italy. It provides secondary treatment for a population of 2,019.
UtilityRadar indexes 4089 wastewater treatment plants in Italy, with treatment level, capacity, operator and discharge data on each record.
Among the indexed plants, SANTA_CESAREA_TERME_NUOVO has the highest designed capacity at 9,500 m3/day.