4,089 plants indexed. Showing 871 matching current filters.
Sant'Arsenio Impianto Localita Fornace is a secondary wastewater treatment plant serving 2,550 people in Sant'Arsenio, Campania, Italy. It discharges 504.81 m³/day of treated effluent.
Ariano Irpino Impianto Camporeale Zona PIP is a secondary treatment plant in Campania, Italy, serving a small population. It has a designed capacity of 20,000 m³/day and discharges 5.94 m³/day.
APOLLOSA_IMPIANTO_FRAZIONE_SAN_GIOVANNI is a secondary treatment plant serving Apollosa, Campania, Italy. It handles a daily discharge volume of 197.96 cubic meters for a population of 1,000.
APOLLOSA_IMPIANTO_DEL_CENTRO_LOCALITA_DONATI is a secondary wastewater treatment plant serving 1,400 people in Apollosa, Campania, Italy. It has a designed capacity of 1,500 m³/day and discharges 277.15 m³/day.
APICE_DEPURATORE_SPINA is a secondary treatment plant serving Apice, Campania, Italy. It treats wastewater for 1,400 residents with a designed capacity of 3,500 cubic meters per day.
Bonito Irpino Impianto di Bonito is a secondary treatment plant serving 1,800 people in Bonito, Campania, Italy. It discharges 356.34 m³/day of treated wastewater into the local watershed.
FOGLIANISE_DEPURATORE_VIA_SERRADOCILE is a secondary treatment plant serving Cautano, Italy. It treats wastewater from approximately 1,500 people with a designed capacity of 1,500 cubic meters per day.
ALVIGNANO_IMPIANTO_LOCALITA_MAZZAMAURO is a secondary treatment plant serving Alvignano, Campania, Italy. It treats wastewater from about 3,450 people with a designed capacity of 3,500 m³/day.
ALTAVILLA_IRPINA_IMPIANTO_DI_PONTE_DEI_SANTI is a secondary treatment plant serving Pasquarielli, Campania, Italy. It treats wastewater for 3,522 people with a designed capacity of 5,000 m³/day.
ALIFE_IMPIANTO_DI_TOTARI is a secondary treatment plant serving about 500 people in Alife, Campania, Italy. It discharges treated wastewater into the local watershed, contributing to the Volturno River basin.
TODI_IMPIANTI_SPORTIVI is a secondary wastewater treatment plant in Todi, Umbria, Italy, serving a population of 1,478. It discharges 292.59 cubic meters per day and has a designed capacity of 4,000 cubic meters per day.
TODI_CENTRO is a secondary wastewater treatment plant serving 860 people in Todi, Umbria, Italy. It discharges 170.25 m³/day of treated effluent into the local watershed.
TODI_CASCIANELLA wastewater treatment plant serves Todi, Umbria, Italy, with secondary treatment for a population of 2,464. It discharges 487.78 m³/day and has a designed capacity of 25,000 m³/day.
TODI_ACCORPAMENTO is a secondary wastewater treatment plant serving Todi, Umbria, Italy. It treats municipal wastewater for a population of 3,138 with a designed capacity of 6,400 m³/day.
Perugia San Martino is a secondary wastewater treatment plant serving 4,114 people in Perugia, Umbria, Italy. It discharges 814.43 m³/day of treated effluent into the local watershed.
OSCHIRI_REG_CARROZZA is a secondary wastewater treatment plant serving Oschiri, Sardinia, Italy. It treats wastewater from a population of 3,768 with a designed capacity of 4,000 m³/day.
Padria Loc Sa Pedraia is a secondary wastewater treatment plant serving about 5,000 people in Padria, Sardinia, Italy. It discharges approximately 992 m³/day and has a designed capacity of 6,500 m³/day.
SCALO_LOC_PESCOPANA is a secondary wastewater treatment plant serving Roccasecca, Lazio, Italy. It treats wastewater from a population of 1,500 with a designed capacity of 1,500 m³/day.
ORUNE_LOC_SERI is a secondary treatment plant serving Orune, Sardinia, Italy. It treats wastewater for a population of 3,021 with a designed capacity of 3,100 cubic meters per day.
Sorgono wastewater treatment plant serves the town of Sorgono in Sardinia, Italy, with secondary treatment for a population of 3,484. The plant has a designed capacity of 3,500 cubic meters per day.
UtilityRadar indexes 4089 wastewater treatment plants in Italy, with treatment level, capacity, operator and discharge data on each record.
Among the indexed plants, TODI_CASCIANELLA has the highest designed capacity at 25,000 m3/day.