Wastewater plants in Italy

4,089 plants indexed. Showing 36 matching current filters.

36 plants matching filters

ALTOMONTE_CENTRO_S_ELIA

Sangineto Lido, Calabria

ALTOMONTE CENTRO S ELIA is a primary treatment plant in Sangineto Lido, Calabria, Italy, serving 2,194 people with a designed capacity of 2,800 m³/day and a discharge volume of 434.33 m³/day.

Primary 2,194 High

BORGO_GRAPPA

Latina, Lazio

Borgo Grappa advanced wastewater treatment plant serves 1,500 people in Latina, Lazio, Italy. It discharges 296.95 cubic meters daily and is located within 10 km of the Tyrrhenian Sea coast.

Advanced 1,500 High

CAMPLI_FLORIANO

Campli, Abruzzo

CAMPLI_FLORIANO is a secondary wastewater treatment plant serving 2,400 people in Campli, Abruzzo, Italy. It discharges 475.12 m³/day and is located within 10 km of the Adriatic coast.

Secondary 2,400 High

CONTRADA_MENDOLILLI

Vittoria, Sicilia

Contrada Mendolilli is a primary treatment plant serving Vittoria, Sicily, Italy. It discharges near the coast and serves a population of 54,000, with a designed capacity of 55,000 m³/day.

Primary 54,000 High

CRETONI_MSP_DEP

Monsampolo del Tronto, Marche

CRETONI_MSP_DEP is a secondary treatment plant in Monsampolo del Tronto, Marche, Italy, serving 215 people. It discharges 33.89 m³/day of treated wastewater within 10 km of the Adriatic coast.

Secondary 215 High

GUAZZETTI_MTR_DEP

Montegranaro, Unknown

GUAZZETTI_MTR_DEP is an advanced wastewater treatment plant serving Montegranaro, Italy. It has a designed capacity of 10,000 m³/day and serves a population of 4,009, discharging treated effluent near the Adriatic coast.

Advanced 4,009 High

IDL_STAGNO

Collesalvetti, Toscana

IDL_STAGNO is a secondary wastewater treatment plant serving Collesalvetti, Toscana, Italy. It treats wastewater for approximately 4,837 people with a designed capacity of 8,000 m³/day.

Secondary 4,837 High

IMPIANTO_C_DA_LUSIA_COMUNALE

Ragusa, Sicilia

IMPIANTO C DA LUSIA COMUNALE is a secondary wastewater treatment plant serving Ragusa, Sicily, Italy. It treats wastewater for approximately 28,600 people with a designed capacity of 40,000 m³/day.

Secondary 28,600 High

IMPIANTO_C_DA_PARTINIEDDU_SOTTOPAESE

Giardinello, Sicilia

Impianto C da Partinieddu Sottopaese is a secondary wastewater treatment plant in Giardinello, Sicily, serving 1,800 people. It discharges treated effluent near the coast, operating under Italy's implementation of the EU Urban Waste Water Treatment D

Secondary 1,800 High

IMPIANTO_C_DA_PIANO_COLOSI

Villafrati, Sicilia

IMPIANTO C DA PIANO COLOSI is a primary treatment plant serving Villafrati, Sicily, Italy. It handles a population equivalent of 3,900 and discharges treated wastewater near the coast.

Primary 3,900 High

IMPIANTO_C_DA_POZZILLO_ROSSELLI

Altavilla Milicia, Sicilia

IMPIANTO C DA POZZILLO ROSSELLI is a secondary wastewater treatment plant in Altavilla Milicia, Sicily, serving 5,000 people. It discharges 989.82 m³/day of treated effluent near the Tyrrhenian Sea coast.

Secondary 5,000 High

IMPIANTO_C_DA_PRAIA

Mercurio, Sicilia

Impianto C da Praia is a primary treatment plant serving 3,700 people in Mercurio, Sicily, Italy. It discharges 732.47 m³/day of treated wastewater within 10 km of the coast.

Primary 3,700 High

IMPIANTO_C_DA_S_MARIA

Castell'Umberto, Sicilia

IMPIANTO C DA S MARIA is a primary treatment plant serving Castell'Umberto, Sicily, Italy. It discharges approximately 297 m³/day of treated wastewater near the coast.

Primary 1,500 High

IMPIANTO_CDA_LUSIA_CONSORZIO_A_S_I_

Ragusa, Sicilia

IMPIANTO CDA LUSIA CONSORZIO A S I is a secondary wastewater treatment plant serving Ragusa, Sicily, Italy. It treats wastewater for 41,400 people with a designed capacity of 59,400 m³/day.

Secondary 41,400 High

IMPIANTO_CONSORTILE_CONTRADA_MAGANUCO_NEL_TERRITORIO_DI_MODICA_POZZALLO_ASI_MODICA_MARINA_DI_MODICA

Modica, Sicilia

IMPIANTO CONSORTILE CONTRADA MAGANUCO is a secondary treatment plant serving Modica, Pozzallo, and Marina di Modica in Sicily, Italy. It treats wastewater from approximately 36,174 people with a designed capacity of 38,000 m³/day.

Secondary 36,174 High

IMPIANTO_DI_DEPURAZIONE_DI_GAGGI

Castiglione di Sicilia, Sicilia

Impianto di Depurazione di Gaggi is a primary treatment plant serving 3,500 people in Castiglione di Sicilia, Sicily, Italy. It discharges 692.88 m³/day of treated wastewater near the coast.

Primary 3,500 High

IMPIANTO_S_NICOLA_L_ARENA_SCALO_MARITTIMO

Trabia, Sicilia

Impianto S. Nicola l'Arena Scalo Marittimo is a secondary wastewater treatment plant serving 5,000 people in Trabia, Sicily, Italy. It discharges treated effluent near the Tyrrhenian Sea coast.

Secondary 5,000 High

IMPIANTO_VIA_CANNITELLO

Santa Margherita di Belice, Sicilia

Impianto Via Cannitello is a primary treatment plant in Santa Margherita di Belice, Sicily, serving 864 people. It discharges 171.04 m³/day of treated wastewater near the coast.

Primary 864 High

IMPIANTO_VILLAGGIO_MOSE_

Agrigento, Sicilia

IMPIANTO VILLAGGIO MOSE is a secondary wastewater treatment plant serving 1,500 people in Agrigento, Sicily, Italy. Located within 10 km of the coast, it discharges treated effluent into the Mediterranean Sea.

Secondary 1,500 High

MOLOCHIO_GERA

Stilo, Calabria

Molochio Gera is a secondary wastewater treatment plant serving Stilo, Calabria, Italy. It discharges treated wastewater near the Ionian Sea coast, with a designed capacity of 4,000 m³/day.

Secondary 2,726 High
UtilityRadar
More
Press Esc to close · Advanced search