4 plants indexed.
Atletica wastewater treatment plant serves San Miguel el Alto, Jalisco, Mexico, providing secondary treatment for a population of 3,651. The plant has a design capacity of 345.60 volume units.
Belem wastewater treatment plant serves San Miguel el Alto, Jalisco, Mexico. It provides secondary treatment for a population of 827, with a designed capacity of 86.40 volume units.
Mirandillas wastewater treatment plant serves San Miguel el Alto, Jalisco, Mexico. It provides secondary treatment for a population of 926, discharging 172.80 cubic meters per day.
San Miguel El Alto wastewater treatment plant serves the city of San Miguel el Alto in Jalisco, Mexico. It treats wastewater from a population of approximately 14,775.
UtilityRadar indexes 4 wastewater treatment plants in San Miguel el Alto, with treatment level, capacity, operator and discharge data on each record.
Among the plants on this page, the most-referenced operator is SIAPA Guadalajara. UtilityRadar's records show 4 plants linked to this operator.
Among the indexed plants, Atletica has the highest designed capacity at 346 m3/day.