4 plants indexed. Showing 3 matching current filters.
Atletica wastewater treatment plant serves San Miguel el Alto, Jalisco, Mexico, providing secondary treatment for a population of 3,651. The plant has a design capacity of 345.60 volume units.
Belem wastewater treatment plant serves San Miguel el Alto, Jalisco, Mexico. It provides secondary treatment for a population of 827, with a designed capacity of 86.40 volume units.
Mirandillas wastewater treatment plant serves San Miguel el Alto, Jalisco, Mexico. It provides secondary treatment for a population of 926, discharging 172.80 cubic meters per day.
UtilityRadar indexes 4 wastewater treatment plants in San Miguel el Alto, with treatment level, capacity, operator and discharge data on each record.
Among the plants on this page, the most-referenced operator is SIAPA Guadalajara. UtilityRadar's records show 3 plants linked to this operator.
Among the indexed plants, Atletica has the highest designed capacity at 346 m3/day.