5 plants indexed.
Fraccionamiento Los Mangos is a secondary wastewater treatment plant in Poza Rica, Veracruz, Mexico. It serves a population of 3,651 and has a designed capacity of 864.00 m³/day.
Unidad Habitacional Alejandro Mondragon is a secondary treatment plant in Poza Rica, Veracruz, Mexico, serving 274 people with a designed capacity of 30.24 m³/day.
Unidad Habitacional Andres Togores is a secondary wastewater treatment plant in Poza Rica, Veracruz, Mexico, serving 274 people with a designed capacity of 30.24 m³/day and actual discharge of 25.92 m³/day.
Unidad Habitacional Irina G Mondragon is a secondary wastewater treatment plant in Poza Rica, Veracruz, Mexico. It serves 274 people with a designed capacity of 30.24 m³/day and a discharge volume of 25.92 m³/day.
Unidad Habitacional Ruben Leon Probert is a secondary wastewater treatment plant in Poza Rica, Veracruz, Mexico. It serves 274 people with a designed capacity of 30.24 m³/day and discharges 25.92 m³/day.