Wastewater plants in Poland

1,667 plants indexed.

1,667 plants

Stare Kurowo

Bledzew, województwo lubuskie

Stare Kurowo wastewater treatment plant serves the Bledzew area in województwo lubuskie, Poland. It provides secondary treatment for a population of 944 and has a designed capacity of 9,000 m³/day.

Secondary 944 Low

Nowogrod Bobrzanski

Nowogród Bobrzański, województwo lubuskie

Nowogrod Bobrzanski wastewater treatment plant serves Nowogród Bobrzański, Poland, with primary treatment for a population of 3,749. The plant has a designed capacity of 9,600 m³/day and discharges 534.55 m³/day.

Primary 3,749 Low

Rzepin

Rzepin, województwo lubuskie

Rzepin wastewater treatment plant in Lubusz Voivodeship, Poland, serves about 5,357 people with secondary treatment. It discharges 763.82 m³/day and has a designed capacity of 8,838 m³/day.

Secondary 5,357 Low

zbaszynek

Zbąszynek, województwo lubuskie

Zbąszynek wastewater treatment plant in Lubusz Voivodeship, Poland, serves about 4,800 people with secondary treatment. It discharges 685 m³/day and has a design capacity of 9,978 m³/day.

Secondary 4,807 Low

Ilowa

Stary Węgliniec, województwo dolnośląskie

Ilowa wastewater treatment plant in Stary Węgliniec, Poland, serves 2,226 people with advanced treatment. It has a designed capacity of 10,000 m³/day and discharges 317.39 m³/day.

Advanced 2,226 Low

Nowe MiasteczkoGolaszyn

Nieciecz, województwo lubuskie

Nowe Miasteczko Golaszyn secondary treatment plant serves 2,196 people in Nieciecz, Poland. It discharges 313 m³/day of treated wastewater into local waterways.

Secondary 2,196 Low

SULECIN

Długoszyn, województwo lubuskie

SULECIN wastewater treatment plant in Długoszyn, Poland, serves about 5,059 people with secondary treatment. It discharges 721.33 m³/day and has a designed capacity of 12,484.00 m³/day.

Secondary 5,059 Low

Keszyca Lesna

Kęszyca Leśna, województwo lubuskie

Keszyca Lesna wastewater treatment plant in Kęszyca Leśna, Poland, serves 1,125 people with secondary treatment. It discharges 160.41 m³/day and has a designed capacity of 1,517 m³/day.

Secondary 1,125 Low

Stary Kostrzyn

Kostrzyn nad Odrą, województwo lubuskie

Stary Kostrzyn wastewater treatment plant serves 526 people in Kostrzyn nad Odrą, Poland. It provides secondary treatment with a designed capacity of 618 m³/day and discharges 75 m³/day.

Secondary 526 Low

Miejska Oczyszczalnia Sciekow

Osiecko, województwo lubuskie

Miejska Oczyszczalnia Sciekow in Osiecko, Poland, is an advanced wastewater treatment plant serving approximately 6,905 people. It has a designed capacity of 27,500 m³/day and discharges 984.55 m³/day of treated effluent.

Advanced 6,905 Low

Oczyszczalnia Sciekow ul Akacjowa w Wiechlicach wlaczona do eksploatacji od dnia 15092014r

Śliwnik, województwo lubuskie

Oczyszczalnia Sciekow ul Akacjowa w Wiechlicach is an advanced wastewater treatment plant in Śliwnik, Poland, serving 6,364 people with a designed capacity of 37,500 m³/day.

Advanced 6,364 Low

LEMNA

Kargowa, województwo lubuskie

LEMNA wastewater treatment plant serves Kargowa, Poland, treating municipal wastewater for approximately 4,741 people. It operates with secondary treatment and has a designed capacity of 9,000 m³/day.

Secondary 4,741 Low

Marzenin

Strugienice, województwo łódzkie

Marzenin wastewater treatment plant in Strugienice, Poland, serves 599 people with secondary treatment. It discharges 85.41 m³/day and has a designed capacity of 2250 m³/day.

Secondary 599 Low

Zawada

Kolonia Zawada, województwo łódzkie

Zawada wastewater treatment plant in Kolonia Zawada, Poland, serves a small population of 474 with secondary treatment. The plant is currently closed.

Secondary 474 Low

Uniejow

Gruszczyce, województwo łódzkie

Uniejow wastewater treatment plant in Gruszczyce, Poland, serves a population of 2,486 with secondary treatment. It discharges 354.47 m³/day and has a designed capacity of 987.00 m³/day.

Secondary 2,486 Low

LIBISzoW

Libiszów, województwo łódzkie

Libiszów wastewater treatment plant in Łódź Voivodeship, Poland, serves 354 people with secondary treatment. The facility discharges 50.48 m³/day and has a designed capacity of 1900 m³/day.

Secondary 354 Low

MROCzKoW GOSCINNY

Bielowice, województwo łódzkie

Mroczkow Goscinny wastewater treatment plant in Bielowice, Poland, serves 227 people with primary treatment. It discharges 32.37 m3/day and has a designed capacity of 1700 m3/day.

Primary 227 Low

Wolborz

Wolbórz, województwo łódzkie

Wolborz wastewater treatment plant in Wolbórz, Poland, serves a small population of 993 with secondary treatment. It discharges 141.59 m³/day and has a designed capacity of 5455 m³/day.

Secondary 993 Low

R0kiciny

Rokiciny, województwo łódzkie

R0kiciny wastewater treatment plant serves the town of Rokiciny in województwo łódzkie, Poland. It provides secondary treatment for a population of 1,340 and discharges 191.06 m³/day of treated effluent.

Secondary 1,340 Low

ECOLO CHIEF

Cegielnia, województwo świętokrzyskie

ECOLO CHIEF is a secondary treatment plant serving Cegielnia, Poland. It treats wastewater for 1,670 people with a discharge volume of 238.12 units and a designed capacity of 9,999.00 units.

Secondary 1,670 Low

Frequently asked

How many wastewater treatment plants are in Poland?

UtilityRadar indexes 1667 wastewater treatment plants in Poland, with treatment level, capacity, operator and discharge data on each record.

What is the largest wastewater treatment plant in Poland?

Among the indexed plants, Oczyszczalnia Sciekow ul Akacjowa w Wiechlicach wlaczona do eksploatacji od dnia 15092014r has the highest designed capacity at 37,500 m3/day.

UtilityRadar
More
Press Esc to close · Browse by sector