Wastewater plants in Portugal

496 plants indexed.

496 plants

Torres do Mondego

Coimbra, Unknown

Torres do Mondego is an advanced wastewater treatment plant serving 1,489 people in Coimbra, Portugal. It discharges 248.26 cubic meters of treated wastewater daily, with a designed capacity of 3,800 cubic meters.

Advanced 1,489 Low

Algoz e Tunes

Algoz, Unknown

Algoz e Tunes wastewater treatment plant serves 2,800 people in Algoz, Portugal, with secondary treatment. It discharges 466.85 m³/day and is located within 10 km of the coast.

Secondary 2,800 Medium

Penices

Vila Nova de Famalicão, Unknown

Penices wastewater treatment plant serves Vila Nova de Famalicão, Portugal, treating wastewater from approximately 30,200 people. It is located inland but within 50 km of the coast, discharging into the local watershed.

Not Reported 30,200 Low

Inha

Santa Maria da Feira, Unknown

Inha wastewater treatment plant serves Santa Maria da Feira, Portugal, treating municipal wastewater for approximately 8,700 people. The facility is located inland in the Aveiro district.

Not Reported 8,700 Low

Cachao

Mirandela, Unknown

Cachao wastewater treatment plant serves the Mirandela area in Bragança, Portugal. It handles a population equivalent of 7,900 and operates under EU Urban Waste Water Treatment Directive standards.

Not Reported 7,900 Low

Argoncilhe

Santa Maria da Feira, Unknown

Argoncilhe wastewater treatment plant serves Santa Maria da Feira, Portugal, treating wastewater for approximately 13,900 people. It operates under the EU Urban Waste Water Treatment Directive.

Not Reported 13,900 Low

Geres

Terras de Bouro, Unknown

Geres wastewater treatment plant serves the Terras de Bouro area in Braga, Portugal, with a population equivalent of 8,000. The plant operates under Portugal's implementation of the EU Urban Waste Water Treatment Directive.

Not Reported 8,000 Low

Soalhaes

Soalhães, Unknown

Soalhaes wastewater treatment plant serves the town of Soalhães in Marco de Canaveses, Porto, Portugal. It treats wastewater from a population of approximately 7,000.

Not Reported 7,000 Low

ETAR Sul Aguada de Cima

Águeda, Unknown

ETAR Sul Aguada de Cima is a wastewater treatment plant serving 7,400 people in Águeda, Portugal. It operates under EU Urban Waste Water Treatment Directive standards for small agglomerations.

Not Reported 7,400 Low

S Romao

Seia, Unknown

S Romao wastewater treatment plant serves the town of Seia in the Guarda district of Portugal. It handles a population equivalent of 7,500 and is located inland, over 50 km from the coast.

Not Reported 7,500 Low

Figueiros Alguber

Cadaval, Unknown

Figueiros Alguber wastewater treatment plant serves the Cadaval area in Portugal. It has a designed capacity of 1.00 (unit unspecified) and serves a population of 8,200.

Not Reported 8,200 Low

Cavado_Homem

Vila Verde, Unknown

Cavado_Homem wastewater treatment plant serves Vila Verde, Portugal, with a designed capacity of 1.00 volume unit. It operates under the EU Urban Waste Water Treatment Directive, ensuring environmental protection for the local watershed.

Not Reported 9,800 Low

Agua Longa

Santo Tirso, Unknown

Agua Longa wastewater treatment plant serves 12,200 people in Santo Tirso, Portugal. It operates under the EU Urban Waste Water Treatment Directive, with a designed capacity of 1.00 volume units.

Not Reported 12,200 Low

Lordelo

Santo Tirso, Unknown

Lordelo wastewater treatment plant serves Santo Tirso, Portugal, with a population equivalent of 143,400. It operates under the EU Urban Waste Water Treatment Directive, which mandates secondary treatment for agglomerations of this scale.

Not Reported 143,400 Low

Turcifal

Torres Vedras, Unknown

Turcifal wastewater treatment plant serves 6,000 people in Torres Vedras, Portugal. It operates under EU Urban Waste Water Treatment Directive standards for small agglomerations.

Not Reported 6,000 Low

Pedreiras

Porto de Mós, Unknown

Pedreiras wastewater treatment plant serves the town of Porto de Mós in Leiria, Portugal. It is designed for a capacity of 1.00 and serves a population of 6,000.

Not Reported 6,000 Low

S Pedro

Figueira da Foz, Unknown

S Pedro wastewater treatment plant serves Figueira da Foz, Portugal, with a designed capacity of 1.00 and a population equivalent of 6,800. The plant discharges into the Atlantic coastal environment.

Not Reported 6,800 Low

Vilar_Sernancelhe

Escurquela e Fonte Arcada, Unknown

Vilar_Sernancelhe wastewater treatment plant serves Escurquela e Fonte Arcada in Sernancelhe, Viseu, Portugal. It treats wastewater from a population of approximately 9,300.

Not Reported 9,300 Low

Vila Pouca de Aguiar

Vila Pouca de Aguiar, Unknown

Vila Pouca de Aguiar wastewater treatment plant serves 7,100 people in northern Portugal. It operates under the EU Urban Waste Water Treatment Directive, which mandates secondary treatment for agglomerations of this size.

Not Reported 7,100 Low

Ruaes

Braga, Unknown

Ruaes wastewater treatment plant serves the Braga area in Portugal, with a designed capacity of 1.00 and serving a population of 10,000. It operates under the EU Urban Waste Water Treatment Directive.

Not Reported 10,000 Low

Frequently asked

How many wastewater treatment plants are in Portugal?

UtilityRadar indexes 496 wastewater treatment plants in Portugal, with treatment level, capacity, operator and discharge data on each record.

What is the largest wastewater treatment plant in Portugal?

Among the indexed plants, Torres do Mondego has the highest designed capacity at 3,800 m3/day.

UtilityRadar
More
Press Esc to close · Browse by sector