4 plants indexed. Showing 2 matching current filters.
TENOYA is a secondary wastewater treatment plant in Las Palmas de Gran Canaria, Canarias, Spain, serving 7,086 people with a designed capacity of 6,800 m³/day and a discharge volume of 878.82 m³/day.
EL FONDILLO is a closed secondary treatment plant in Las Palmas de Gran Canaria, Canarias, Spain. It was designed for a capacity of 6,000 m³/day and is located within 10 km of the coast.
UtilityRadar indexes 4 wastewater treatment plants in Las Palmas de Gran Canaria, with treatment level, capacity, operator and discharge data on each record.
Among the indexed plants, TENOYA has the highest designed capacity at 6,800 m3/day.