Wastewater plants in Canarias

89 plants indexed. Showing 81 matching current filters.

81 plants matching filters

HARIA

Teguise, Canarias

HARIA wastewater treatment plant in Teguise, Canarias, Spain, serves 4,000 people with advanced treatment. It discharges 157.08 m³/day and is located near the coast of Lanzarote.

Advanced 4,000 Medium

TEROR

Teror, Canarias

TEROR wastewater treatment plant in Teror, Canarias, Spain, serves a population of 9,398 with advanced treatment. It discharges 910.83 m³/day and has a designed capacity of 10,000 m³/day.

Advanced 9,398 Medium

SAN MATEO

Vega de San Mateo, Canarias

SAN MATEO is an advanced wastewater treatment plant in Vega de San Mateo, Canarias, Spain. It serves a population of 4,131 and discharges 419.65 m³/day, with a designed capacity of 5,000 m³/day.

Advanced 4,131 Medium

EDAR de Punta del Hidalgo

San Cristóbal de La Laguna, Canarias

EDAR de Punta del Hidalgo is a secondary wastewater treatment plant in San Cristóbal de La Laguna, Canary Islands, Spain. It serves approximately 7,143 people and discharges treated water near the coast.

Secondary 7,143 Medium

AEROPUERTO FUERTEVENTURA

Puerto del Rosario, Canarias

AEROPUERTO FUERTEVENTURA is an advanced wastewater treatment plant in Puerto del Rosario, Canary Islands, Spain. It serves a population of 2,350 and discharges treated water near the coast.

Advanced 2,350 Medium

EDAR Municipal de Garachico

Garachico, Canarias

EDAR Municipal de Garachico is a secondary wastewater treatment plant serving 3,903 people in Garachico, Canary Islands, Spain. It discharges 707.41 m³/day and is located within 10 km of the coast.

Secondary 3,903 Medium

ETAR de Caletillas

Candelaria, Canarias

ETAR de Caletillas is a primary treatment plant serving 2,442 people in Candelaria, Canary Islands, Spain. It discharges 442.61 m³/day of treated wastewater near the coast of Tenerife.

Primary 2,442 Medium

ETAR de Punta Blanca

Guía de Isora, Canarias

ETAR de Punta Blanca is a primary treatment plant in Guía de Isora, Canary Islands, Spain. Serving about 1,988 people, it discharges treated wastewater near the coast.

Primary 1,988 Medium

ETAR de San Andres

Santa Cruz de Tenerife, Canarias

ETAR de San Andres is a primary treatment plant in Santa Cruz de Tenerife, Canary Islands, Spain, serving 4,618 people. It discharges 837 m³/day of treated wastewater near the coast.

Primary 4,618 Medium

ETAR de Tabaiba

El Rosario, Canarias

ETAR de Tabaiba is a primary treatment plant in El Rosario, Tenerife, Canary Islands, serving 4,611 people with a designed capacity of 10,000 m³/day and discharging 835.73 m³/day.

Primary 4,611 Medium

CABO VERDE

Moya, Canarias

Cabo Verde wastewater treatment plant in Moya, Canary Islands, Spain, serves 6,370 people with advanced treatment. It discharges 709.75 m³/day and has a designed capacity of 5,000 m³/day.

Advanced 6,370 Medium

BANADEROS

Arucas, Canarias

BANADEROS wastewater treatment plant in Arucas, Canarias, Spain, serves approximately 5,796 people with secondary treatment. It discharges 722.52 m³/day and is located near the coast.

Secondary 5,796 Medium

FIRGAS

Firgas, Canarias

FIRGAS is an advanced wastewater treatment plant in Firgas, Canarias, Spain, serving a population of 5,925. It discharges treated water near the coast, with a designed capacity of 6,000 m³/day.

Advanced 5,925 Medium

BAHIA FELIZ

San Bartolomé de Tirajana, Canarias

Bahia Feliz is a secondary-level wastewater treatment plant in San Bartolomé de Tirajana, Canary Islands, Spain. It discharges treated water near the coast, serving the local tourism-driven community.

Secondary Medium

TAURITO

Mogán, Canarias

TAURITO wastewater treatment plant serves Mogán, Canarias, Spain. It provides secondary treatment and discharges treated wastewater near the coast.

Secondary Medium

ETAR Playa San Juan

Guía de Isora, Canarias

ETAR Playa San Juan is a wastewater treatment plant serving 11,794 people in Guía de Isora, Canarias, Spain. Located on the coast of Tenerife, it plays a key role in protecting coastal waters.

Not Reported 11,794 Medium

ETAR de Los Gigantes

Santiago del Teide, Canarias

ETAR de Los Gigantes is a wastewater treatment plant serving 12,400 people in Santiago del Teide, Tenerife, Canary Islands. It is located near the coast and operates under Spanish and EU wastewater regulations.

Not Reported 12,400 Medium

ETAR de Puerto de Santiago

Santiago del Teide, Canarias

ETAR de Puerto de Santiago is a wastewater treatment plant serving Santiago del Teide in the Canary Islands, Spain. It treats wastewater from approximately 12,539 residents.

Not Reported 12,539 Medium

ETAR de Los Tarajales

Güímar, Canarias

ETAR de Los Tarajales is a wastewater treatment plant serving Güímar, Tenerife, Canary Islands, Spain. It serves a population of 9,652 and is located near the coast.

Not Reported 9,652 Medium

ETAR de Ensenada Pelada

Granadilla de Abona, Canarias

ETAR de Ensenada Pelada is a wastewater treatment plant serving Granadilla de Abona, Tenerife, Canary Islands, Spain. It serves a population of 21,900 and has a designed capacity of 1.00 cubic meters per day.

Not Reported 21,900 Medium

Frequently asked

How many wastewater treatment plants are in Canarias?

UtilityRadar indexes 89 wastewater treatment plants in Canarias, with treatment level, capacity, operator and discharge data on each record.

What is the largest wastewater treatment plant in Canarias?

Among the indexed plants, EDAR de Punta del Hidalgo has the highest designed capacity at 10,833 m3/day.

UtilityRadar
More
Press Esc to close · Browse by sector