397 plants indexed worldwide.
Basic treatment. Solids are removed via settling and screening only.
El Refugio de Los Sauces is a primary treatment plant serving 1,296 people in Silao de la Victoria, Guanajuato, Mexico. It discharges 122.69 cubic meters of treated wastewater daily.
ELIOT 50 Oczyszczalnia sciekow Pilchowice Piaski is a primary treatment plant serving 585 people in Pilchowice, Silesia, Poland. It discharges 83.41 m³/day of treated wastewater into local waters.
ETAR de Acorán is a primary treatment plant in Santa Cruz de Tenerife, Canary Islands, Spain, serving about 4,400 people. It discharges treated wastewater near the coast, operating under Spanish and EU regulations.
ETAR de Caletillas is a primary treatment plant serving 2,442 people in Candelaria, Canary Islands, Spain. It discharges 442.61 m³/day of treated wastewater near the coast of Tenerife.
ETAR de Los Silos is a primary treatment plant serving 3,248 people in Los Silos, Canary Islands, Spain. It discharges 588.69 m³/day of treated wastewater near the coast.
ETAR de Punta Blanca is a primary treatment plant in Guía de Isora, Canary Islands, Spain. Serving about 1,988 people, it discharges treated wastewater near the coast.
ETAR de San Andres is a primary treatment plant in Santa Cruz de Tenerife, Canary Islands, Spain, serving 4,618 people. It discharges 837 m³/day of treated wastewater near the coast.
ETAR de Tabaiba is a primary treatment plant in El Rosario, Tenerife, Canary Islands, serving 4,611 people with a designed capacity of 10,000 m³/day and discharging 835.73 m³/day.
ETAR del Polígono Industrial de Granadilla is a primary treatment plant in Arico, Canarias, Spain, serving a population of 2,931. It discharges 531.24 m³/day of treated wastewater near the coast.
ETAR Los Abrigos is a primary wastewater treatment plant in Granadilla de Abona, Tenerife, Canary Islands, serving approximately 4,087 people with a design capacity of 10,000 m³/day.
ETE Abaeté is a primary treatment plant in Campinas, São Paulo, Brazil, serving approximately 2,466 people. It discharges 340.42 m³/day of treated wastewater into local water bodies.
ETE AREA DE LAZER is a primary treatment plant serving 28 people in Machadinho, Rio Grande do Sul, Brazil. It discharges 119.23 m³/day of treated wastewater.
ETE Campo Florido is a primary treatment plant serving 1,803 residents in Campinas, São Paulo, Brazil. It discharges approximately 249 m³/day of treated wastewater into the local watershed.
ETE COHAB NOVA CACERES is a primary treatment plant serving 2,552 residents in Cáceres, Mato Grosso, Brazil. It discharges 432 m³/day of treated wastewater into local waterways.
ETE COHAB NOVA CUIABA is a primary treatment plant serving 672 people in Cuiabá, Mato Grosso, Brazil. It discharges 468.24 cubic meters of treated wastewater, contributing to local water management.
ETE COOPHEMA is a primary treatment plant serving 558 people in Cuiabá, Mato Grosso, Brazil. It discharges 388.80 m³/day of treated wastewater into the local watershed.
ETE RIO DOCE is a primary treatment plant serving 1,372 people in Rio Doce, Minas Gerais, Brazil. It discharges 190.09 m³/day of treated wastewater, supporting local sanitation infrastructure.
ETE Santa Lucia is a primary treatment plant in Campinas, São Paulo, Brazil, serving a small population of 1,033. It discharges 142.56 cubic meters of treated wastewater, contributing to local water management.
ETE Takanos is a primary treatment plant in Campinas, São Paulo, Brazil, serving 732 people. It discharges 101.09 m³/day of treated wastewater into local waterways.
ETE Vila Rica in Santa Bárbara d'Oeste, São Paulo, Brazil, is a primary treatment plant serving 444 people. It discharges 86.40 m³/day of treated wastewater into the local watershed.