18,358 plants indexed worldwide.
Biological process removes dissolved organic matter after primary treatment.
Santa Cruz de La Cuchilla wastewater treatment plant in Cuencamé, Durango, Mexico, serves 493 people with secondary treatment. It discharges 46.66 thousand m³/year, operating below its designed capacity of 52.70 thousand m³/year.
Ignacio Zaragoza wastewater treatment plant in Durango, Mexico, serves a small population of 333 with secondary treatment. It discharges 118.37 m³/day and operates under Mexico's national water regulations.
San Jose de Basoco wastewater treatment plant serves Coneto de Comonfort, Durango, Mexico. It provides secondary treatment for a small population of 219, with a designed capacity of 22.46 volume units.
Coneto de Comonfort wastewater treatment plant in Durango, Mexico, serves 822 people with secondary treatment. It discharges 122.69 m³/day, operating at 94.7% of its 129.60 m³/day design capacity.
Zapotes de Rodríguez wastewater treatment plant in Durango, Mexico, serves 173 people with secondary treatment. It discharges 16.42 units of treated wastewater daily.
Cerro Gordo wastewater treatment plant in Durango, Mexico, serves a small population of 475 with secondary treatment. It discharges 44.93 volume units and has a designed capacity of 105.41.
AnAhuac is a secondary wastewater treatment plant in Colonia Anáhuac, Durango, Mexico, serving 876 people with a design capacity of 184.90 m³/day and a discharge volume of 170.21 m³/day.
Pueblo Nuevo wastewater treatment plant in Sinaloa, Mexico, serves 1,922 people with secondary treatment. It discharges 371.52 m³/day and is located near the coast.
El Espinal Conitaca is a secondary wastewater treatment plant in El Espinal, Sinaloa, Mexico, serving approximately 2,542 people. It has a designed capacity of 380.16 m³/day and discharges 345.60 m³/day.
Peninsula de Villamoros wastewater treatment plant in Sinaloa, Mexico, serves 783 people with secondary treatment. It discharges 172.80 m³/day and is located within 10 km of the Pacific coast.
Agua Caliente de Los Monzon is a secondary treatment plant serving 1,825 people in Sinaloa, Mexico. It discharges 172.80 m³/day of treated wastewater, with a designed capacity of 345.60 m³/day.
San Pablo wastewater treatment plant serves 887 people in Sinaloa, Mexico, with secondary treatment. It discharges 112.32 volume units into local waters, operating under Mexican wastewater regulations.
Choacahui wastewater treatment plant in Sinaloa, Mexico serves 821 people with secondary treatment, discharging 77.76 volume units. It is an inland facility contributing to local water management.
Tepuche wastewater treatment plant serves the community of El Tepuche in Sinaloa, Mexico, providing secondary treatment for a population of 1,825. The plant has a designed capacity of 345.60 m³/day and discharges 172.80 m³/day of treated effluent.
The Oaxaca wastewater treatment plant in Estación Delta, Baja California, Mexico, serves a population of 2,647 with secondary treatment. It discharges 250.56 m³/day and has a designed capacity of 345.60 m³/day.
La Puerta wastewater treatment plant serves Colonia La Puerta in Mexicali, Baja California, Mexico. It provides secondary treatment for a population of 934, with a designed capacity of 518.40 m³/day and a discharge volume of 354.24 m³/day.
San Pedro Chiaucingo wastewater treatment plant serves 2,738 people in San Pedro Chiautzingo, Estado de México, Mexico. It provides secondary treatment with a designed capacity of 518.40 m³/day and a discharge volume of 259.20 m³/day.
Barrio de San Juan wastewater treatment plant in Coyotepec, Estado de México, Mexico, provides secondary treatment for a population of 4,564. It discharges 432.00 volume units daily, with a designed capacity of 864.00.
El Fraile wastewater treatment plant serves 228 people in Nuevo León, Mexico, with secondary treatment. It discharges 21.60 units of treated wastewater into local water bodies.
Yecapixtla wastewater treatment plant in Morelos, Mexico, serves 4,025 people with secondary treatment. It discharges 381.02 cubic meters per day and has a designed capacity of 2,160 cubic meters per day.