1,483 plants indexed. Showing 21 matching current filters.
ROTHBURY STW is a secondary treatment plant serving 1,783 people in Rothbury, Northumberland, England. The plant is now closed.
KELLOE STW is a closed secondary treatment plant in Kelloe, County Durham, England, serving a population of 1,813. It discharged 403.64 cubic meters of treated wastewater before closure.
ABINGDON STW is a closed secondary treatment plant in Sutton Courtenay, Oxfordshire, England. It was designed to handle a capacity of 41,683 cubic meters per day, serving the local area.
High Wycombe BU STW is a closed secondary treatment plant in Buckinghamshire, England, with a designed capacity of 64,136 m³/day. It served the High Wycombe area before decommissioning.
Fyfield STW is a closed secondary treatment plant in Fyfield, Wiltshire, England, with a designed capacity of 2,320 m³/day. It served the local community under UK wastewater regulations.
WYCHBOLD STW is a closed secondary treatment plant in Wychbold, Wychavon, England, UK. It served the local area with a designed capacity of 1,671 cubic meters per day.
HATHERSAGE STW is a closed secondary treatment plant in Derbyshire Dales, England, with a designed capacity of 1803 cubic meters per day. It served the local community before decommissioning.
ALTHORPE STW FINAL EFFLUENT is a closed secondary treatment plant in Keadby, England. It served the local area before decommissioning, with a designed capacity of 1967 cubic meters.
Findern STW Final Effluent is a closed secondary treatment plant in South Derbyshire, England. It served the local community before decommissioning.
Alveley STW Final Effluent is a closed secondary treatment plant in Alveley, Shropshire, England. It served the local community before decommissioning.
Ambergate Sewage Treatment Works FE is a closed secondary treatment plant in Amber Valley, Derbyshire, England. It served the local community before decommissioning.
SNARESTONE STW is a closed secondary treatment plant in North West Leicestershire, England, with a designed capacity of 2,200 cubic meters per day.
West Burton STW in Bassetlaw, England, is a closed secondary treatment plant with a designed capacity of 3,000 m³/day. It operated under UK wastewater regulations serving the local area.
Pontesbury STW is a closed secondary treatment plant in Pontesbury, Shropshire, England, with a designed capacity of 2,200 cubic meters per day.
WOMBOURNE STW is a closed secondary treatment plant in South Staffordshire, England, with a designed capacity of 21,000. It served the Wombourne area before decommissioning.
SCARCLIFFE STW is a closed secondary treatment plant in Bolsover, Derbyshire, England. It had a designed capacity of 3,000 cubic meters per day, serving the local community under UK wastewater regulations.
MARCHINGTON STW is a closed secondary treatment plant in East Staffordshire, England, with a designed capacity of 3,000 cubic meters per day. It served the local community before decommissioning.
Long Lawford STW is a closed secondary treatment plant near Rugby, England, with a designed capacity of 3000 cubic meters per day. It served the local community before decommissioning.
BRAMCOTE_WOLVEY STW is a closed secondary treatment plant in Rugby, England, with a designed capacity of 3250 m³/day. It served the local area under UK wastewater regulations.
Bishops Castle STW is a closed secondary treatment plant in Bishop's Castle, Shropshire, England. It served the local community before ceasing operations.
UtilityRadar indexes 1483 wastewater treatment plants in England, with treatment level, capacity, operator and discharge data on each record.
Among the plants on this page, the most-referenced operator is Severn Trent Water. UtilityRadar's records show 2 plants linked to this operator.
Among the indexed plants, HIGH WYCOMBE HIGH WYCOMBE BU STW has the highest designed capacity at 64,136 m3/day.