4,089 plants indexed.
Ioppolo Caroniti wastewater treatment plant in Joppolo, Calabria, Italy, serves 800 people with advanced treatment. It discharges 158.37 cubic meters of treated wastewater near the Tyrrhenian Sea coast.
Guardia Piemontese Chiausi is an advanced wastewater treatment plant in Fuscaldo, Calabria, Italy, serving 350 people with a design capacity of 450 m³/day and a discharge volume of 69.29 m³/day.
Guardavalle Mare secondary treatment plant serves 3,500 people in Casa Borgorosso, Calabria, Italy. It discharges 692.88 m³/day and is located within 10 km of the Ionian Sea coast.
Guardavalle Centro secondary treatment plant serves 2,500 people in Guardavalle, Calabria, Italy. It discharges treated wastewater near the Ionian Sea coast.
GROTTERIA_CATALISANO is a secondary wastewater treatment plant serving Oppido Mamertina, Calabria, Italy. It treats wastewater from a population of 3,206 with a designed capacity of 2,500 m³/day.
GRIMALDI_ORTO_MULINO is an advanced wastewater treatment plant in Francavilla Marittima, Calabria, Italy, serving 3,070 people with a designed capacity of 3,000 m³/day and a discharge volume of 607.75 m³/day.
GIOIA_TAURO_NICOTERA_LOC_FILOTTA is an advanced wastewater treatment plant in Nicotera, Calabria, Italy. It serves a small population of 700 and discharges treated water near the Tyrrhenian Sea coast.
GIMIGLIANO_CAVORA is an advanced wastewater treatment plant in Gimigliano, Calabria, Italy, serving 277 people with a designed capacity of 500 m³/day.
GIFFONE_CENTRO is a secondary wastewater treatment plant in Mammola, Calabria, Italy, serving 2,336 people with a designed capacity of 2,500 m³/day and a discharge volume of 462.45 m³/day.
Gerocarne Sambuco is a primary treatment plant serving 100 people in Gerocarne, Calabria, Italy. It discharges 19.80 cubic meters per day into the local watershed.
GEROCARNE_S_SEBASTIANO2 is a primary treatment plant in Gerocarne, Calabria, Italy, serving a small population of 25. It discharges 4.95 cubic meters of wastewater and is located inland, contributing to local water management.
GEROCARNE_S_SEBASTIANO1 is a primary treatment plant in Filogaso, Calabria, Italy, serving 110 people.
Gerocarne S. Antonio is a primary treatment plant in Gerocarne, Calabria, Italy, serving a small population of 60. It discharges 11.88 m³/day of treated wastewater into the local watershed.
Gerocarne Pettinaro wastewater treatment plant serves the small community of Gerocarne in Calabria, Italy. It provides primary treatment and discharges treated water into the local environment.
GEROCARNE_PERARA is an advanced wastewater treatment plant serving Gerocarne, Calabria, Italy. It treats wastewater for approximately 2,000 residents with a designed capacity of 4,000 m³/day.
GEROCARNE_PAESE is a primary-level wastewater treatment plant serving 1,300 people in Gerocarne, Calabria, Italy. It discharges 257.35 cubic meters of treated wastewater daily.
GEROCARNE_MAZZOTTA2 is a primary treatment plant serving 50 people in Sant'Angelo di Gerocarne, Calabria, Italy. It discharges 9.90 m³/day of treated wastewater.
GEROCARNE_MAZZOTTA1 is a primary treatment plant serving 190 people in Sant'Angelo di Gerocarne, Calabria, Italy. It discharges 37.61 m³/day of treated wastewater into local water bodies.
GEROCARNE_MANCUSO is a primary treatment plant serving 230 people in Sant'Angelo di Gerocarne, Calabria, Italy. It discharges 45.53 m³/day of treated wastewater into the local watershed.
GEROCARNE_LANZO_DOMITO is a primary treatment plant serving 80 people in Sant'Angelo di Gerocarne, Calabria, Italy. It discharges 15.84 m³/day of treated wastewater into the local watershed.
UtilityRadar indexes 4089 wastewater treatment plants in Italy, with treatment level, capacity, operator and discharge data on each record.
Among the indexed plants, GUARDAVALLE_MARE has the highest designed capacity at 5,000 m3/day.