496 plants indexed. Showing 191 matching current filters.
Gloria Ribatejo is a secondary wastewater treatment plant serving about 5,000 people in Glória do Ribatejo, Portugal. It discharges 833.65 cubic meters of treated effluent daily.
Carregueira_Pinheiro Grande is a secondary treatment plant in Chamusca, Portugal, serving 4,400 people. It discharges 733.61 m³/day of treated wastewater into local water bodies.
Runa wastewater treatment plant serves the parish of Runa in Torres Vedras, Portugal. It provides secondary treatment for a population of 4,900, discharging 816.98 cubic meters per day.
Couco wastewater treatment plant serves the town of Couço in Santarém, Portugal. It provides secondary treatment for a population of approximately 3,000 and discharges treated effluent into the local watershed.
Sousel wastewater treatment plant serves the town of Sousel in Portalegre, Portugal. It provides secondary treatment for a population of 2,000 and discharges treated effluent into local watercourses.
Pontes de Monfalim is a secondary wastewater treatment plant serving Sobral de Monte Agraço, Portugal. It treats wastewater for a population of 3,000 with a designed capacity of 4,433 m³/day.
Ribeira de Moinhos Poiares is a secondary treatment plant serving Vila Nova de Poiares, Portugal. It treats wastewater for about 4,000 people with a designed capacity of 6,500 m³/day.
Aldeia Gavinha wastewater treatment plant in Alenquer, Portugal, serves 1,700 people with secondary treatment. The plant is now closed, having discharged treated effluent into the local watershed.
Vilarinho dos Freires_Poiares is a secondary wastewater treatment plant serving 2,400 people in Peso da Régua, Portugal. It discharges 400.15 m³/day of treated effluent into the local watershed.
Vila Viçosa wastewater treatment plant in Évora, Portugal serves 5,100 people with secondary treatment. It discharges 850.33 m³/day and has a designed capacity of 7,500 m³/day.
Vila Verde wastewater treatment plant in Braga, Portugal serves 5,000 people with secondary treatment. It discharges 833.65 m³/day and has a designed capacity of 2,016 m³/day.
Vila Verde wastewater treatment plant serves Terrugem, Portugal, treating municipal wastewater for 2,500 residents. The secondary treatment facility discharges 416.83 m³/day and is located within 10 km of the coast.
Vila Nova da Barquinha wastewater treatment plant serves 5,000 people in Santarém, Portugal. It provides secondary treatment and discharges 833.65 m³/day of treated effluent.
Vila Mea wastewater treatment plant serves the town of Vila Meã in Amarante, Portugal. It provides secondary treatment for a population of 5,000 with a designed capacity of 6,000 m³/day.
Vila Flor wastewater treatment plant serves the town of Vila Flor in Bragança, Portugal. It provides secondary treatment for a population of 3,500 with a designed capacity of 4,050 m³/day.
Mosteiro wastewater treatment plant in Vieira do Minho, Portugal, serves 2,500 people with secondary treatment. It discharges 416.83 m³/day and has a designed capacity of 5,679 m³/day.
Vidais secondary wastewater treatment plant serves 2,200 people in Caldas da Rainha, Portugal. It discharges 366.81 m³/day and is located within 10 km of the Atlantic coast.
Viana do Alentejo Zona Oeste is a secondary wastewater treatment plant serving 1,400 people in Viana do Alentejo, Portugal. It discharges 233.42 m³/day of treated effluent into the local watershed.
Viana do Alentejo Aires is a secondary wastewater treatment plant serving 1,300 people in Viana do Alentejo, Portugal. It discharges 216.75 m³/day of treated effluent into the local watershed.
Vale de Santarém secondary treatment plant serves 3,700 people in Santarém, Portugal. It discharges 616.90 m³/day of treated wastewater, with a designed capacity of 5,300 m³/day.
UtilityRadar indexes 496 wastewater treatment plants in Unknown, with treatment level, capacity, operator and discharge data on each record.
Among the indexed plants, Vila Nova da Barquinha has the highest designed capacity at 10,793 m3/day.