496 plants indexed. Showing 217 matching current filters.
Bordalo Pinheiro wastewater treatment plant serves Samora Correia, Portugal, treating wastewater for 1,700 people with secondary treatment. It discharges 283.44 cubic meters daily and is located within 10 km of the coast.
Caldelas wastewater treatment plant in Amares, Portugal serves 2,100 people with secondary treatment. It discharges 350.13 m³/day and has a designed capacity of 2,621 m³/day.
Campos wastewater treatment plant in Vila Nova de Cerveira, Portugal, serves 4,100 people with advanced treatment. It discharges 683.60 m³/day and is located near the coast.
Canedo wastewater treatment plant serves 2,600 people in Santa Maria da Feira, Portugal. It provides secondary treatment and discharges 433.50 m³/day of treated effluent.
Carapinheira e Meas is a secondary wastewater treatment plant serving 3,600 people in Carapinheira, Portugal. It discharges 600.23 m³/day of treated effluent into the local watershed.
Carvalhal wastewater treatment plant in Grândola, Portugal, serves 2,900 people with advanced treatment. It discharges 483.52 m³/day and is located near the coast in the Setúbal district.
Cavaleira is a secondary wastewater treatment plant in Algueirão-Mem Martins, Portugal, serving about 5,000 people. It discharges 833.65 m³/day and is located within 10 km of the coast.
Cercal do Alentejo wastewater treatment plant serves about 3,000 people in Santiago do Cacém, Portugal, with secondary treatment. It discharges approximately 500 m³/day of treated effluent into the local watershed.
Cerrado das Aguas is an advanced wastewater treatment plant serving Benavente, Portugal. It treats wastewater from a population of 5,500 with a designed capacity of 8,000 m³/day and a discharge volume of 917.02 m³/day.
Condeixa A Nova wastewater treatment plant serves Condeixa-a-Nova, Portugal, treating wastewater for 5,800 people with secondary treatment. The plant has a designed capacity of 15,000 m³/day and discharges 967 m³/day.
Coruche wastewater treatment plant serves the town of Coruche in Santarém, Portugal. It provides advanced treatment for a population of 5,100, discharging 850.33 cubic meters of treated wastewater daily.
Covoes wastewater treatment plant in Cantanhede, Portugal serves 3,000 people with advanced treatment. It discharges 500.19 m³/day and has a designed capacity of 3,082 m³/day.
Crespos wastewater treatment plant in Braga, Portugal serves 3,500 people with secondary treatment. It discharges 583.56 m³/day and operates under EU Urban Waste Water Treatment Directive 91/271/EEC.
Crestuma secondary treatment plant serves 3,200 people in Vila Nova de Gaia, Portugal. It discharges 533.54 m³/day of treated wastewater, operating under EU Urban Waste Water Treatment Directive standards.
Dois Portos wastewater treatment plant serves 5,400 people in Torres Vedras, Portugal. It provides secondary treatment and discharges 900.35 m³/day of treated effluent.
Espicandeira wastewater treatment plant serves Alenquer, Portugal, with secondary treatment for a population of 4,620. It discharges 770.30 cubic meters of treated wastewater daily, with a designed capacity of 5,600 cubic meters.
Esteveira is an advanced wastewater treatment plant in Samora Correia, Portugal, serving 3,800 people with a discharge volume of 633.58 m³/day and a designed capacity of 8,000 m³/day.
Faralhao wastewater treatment plant serves 3,500 people in Setúbal, Portugal. It provides secondary treatment and discharges treated effluent near the Sado estuary, a coastal area with ecological significance.
Figueiro do Campo wastewater treatment plant serves the town of Soure, Portugal, treating municipal wastewater for approximately 3,600 residents. The facility provides secondary treatment and discharges a daily volume of 600.23 cubic meters.
Fontainhas wastewater treatment plant in Grândola, Portugal, serves 3,500 people with secondary treatment. It discharges 583.56 m³/day and has a designed capacity of 6,750 m³/day.