89 plants indexed. Showing 86 matching current filters.
EDAR de La Quinta is an advanced wastewater treatment plant in Santa Úrsula, Tenerife, Spain. Serving about 2,028 people, it has a designed capacity of 2,000 m³/day and discharges 367.57 m³/day.
ETAR de Acorán is a primary treatment plant in Santa Cruz de Tenerife, Canary Islands, Spain, serving about 4,400 people. It discharges treated wastewater near the coast, operating under Spanish and EU regulations.
EDAR Parque La Reina is a secondary wastewater treatment plant in Arona, Canary Islands, Spain. It serves a population of 3,283 and has a designed capacity of 12,000 m³/day, discharging 595.04 m³/day.
VALSEQUILLO wastewater treatment plant serves Valsequillo de Gran Canaria, Canarias, Spain, with advanced treatment for a population of 2,155. It discharges 241.11 m³/day and is located within 10 km of the coast.
ETAR Los Abrigos is a primary wastewater treatment plant in Granadilla de Abona, Tenerife, Canary Islands, serving approximately 4,087 people with a design capacity of 10,000 m³/day.
Valle Gran Rey wastewater treatment plant serves 5,100 people in Valle Gran Rey, Canarias, Spain. It provides secondary treatment and discharges 789.04 cubic meters of treated wastewater daily.
VALVERDE wastewater treatment plant in Valverde, Canarias, Spain, serves 352 people with advanced treatment. It discharges 67.40 m³/day and has a designed capacity of 3000 m³/day.
EDAR de Buenavista del Norte is a secondary wastewater treatment plant serving 2,574 people in Buenavista del Norte, Canary Islands, Spain. It discharges 466.53 m³/day and is located within 10 km of the coast.
GANDO wastewater treatment plant in Telde, Canary Islands, Spain serves 6,563 people with secondary treatment. It discharges 768.92 m³/day and has a designed capacity of 8,300 m³/day.
SAN NICOLAS is an advanced wastewater treatment plant in La Aldea de San Nicolás, Canary Islands, Spain. It serves 6,162 people with a designed capacity of 10,000 m³/day and discharges 819.59 m³/day.
TENOYA is a secondary wastewater treatment plant in Las Palmas de Gran Canaria, Canarias, Spain, serving 7,086 people with a designed capacity of 6,800 m³/day and a discharge volume of 878.82 m³/day.
LAS GAVIOTAS is an advanced wastewater treatment plant in Pájara, Canarias, Spain, serving 3,400 people with a designed capacity of 5,000 m³/day and a discharge volume of 616.24 m³/day.
BARRANCO LA VERGA is a secondary wastewater treatment plant in Mogán, Canarias, Spain, serving 3,000 people. It discharges treated effluent near the coast of Gran Canaria.
AGAETE wastewater treatment plant in Agaete, Canary Islands, Spain serves 5,443 people with advanced treatment. It discharges 736.44 cubic meters daily and is located within 10 km of the coast.
EDAR de Marazul is a secondary wastewater treatment plant serving 2,042 people in Adeje, Tenerife, Canary Islands, Spain. It discharges 370.11 m³/day and is located within 10 km of the coast.
TAZACORTE PUERTO is a secondary wastewater treatment plant serving 2,415 people in Tijarafe, Canarias, Spain. It discharges 339.46 m³/day and has a designed capacity of 10,000 m³/day.
SAN ANDRES Y SAUCES wastewater treatment plant serves 1,212 people in San Andrés y Sauces, Canarias, Spain. It provides advanced treatment and discharges treated water near the coast.
PUERTO NAOS is an advanced wastewater treatment plant in Tazacorte, Canarias, Spain, serving a population of 1,798. It discharges 325.88 m³/day of treated effluent near the coast.
LA SANTA is an advanced wastewater treatment plant in Tinajo, Canarias, Spain, serving 2,000 people. It discharges 229.67 m³/day of treated water near the coast of Lanzarote.
HARIA wastewater treatment plant in Teguise, Canarias, Spain, serves 4,000 people with advanced treatment. It discharges 157.08 m³/day and is located near the coast of Lanzarote.
UtilityRadar indexes 89 wastewater treatment plants in Canarias, with treatment level, capacity, operator and discharge data on each record.
Among the indexed plants, EDAR Parque La Reina has the highest designed capacity at 12,000 m3/day.